Saturday, 30 July 2016

September 2015

In September we took delivery from Sally and Phillip at Tithe Barn Shepherds Huts of the curved roof, the sides, door and windows.  At the time I remember Phillip asking Tom how long had he given himself to build it, 12 weeks he says!!!!

A wet winter and other jobs that needed doing meant progress was slow. The frame work was made ready and covered. The floor added and covered to protect, then the roof was started and slowly built.